The +30% in the headline is a thesis about how accessibility looks in an estimate when someone remembers it before delivery. It is not an industry average and not a tax someone is obliged to add. Retrofitting a finished site really does cost more than the same work placed into the layout and the build. The question of who pays is already late at that moment. The payer is whoever did not name the requirement while there was still time not to break what was finished.
01 Where the surcharge comes from
The surcharge comes from rework. Buttons without names, forms without labels, meaning in pictures, contrast that cannot be read, video without an alternative, a focus you cannot see. That is not a separate magic layer. It is a return to screens that were already approved without these conditions.
If the same things are included in the first pass, part of the work does not look like a separate line at all: a normal field label, a visible focus, error text. A separate cost remains where there really is separate work: an audit, fixing something old, complex widgets, sign language, or a transcript of a long video. The thirty-percent thesis describes the first case, when everything was postponed, not the second, where the scope is named honestly.
02 Who should pay
The product owner pays, if it is their market, their contract, and their users. They choose the level and the scenarios that must be finishable. The contractor does not silently gift that scope and has no right to add it as a surprise after an agreed estimate.
The honest split is different. The client names the requirement before kickoff. The estimate includes it in design, content, and build. If the requirement appears at the end, the retrofit is a separate change of scope, and whoever changed the scope pays for it. Arguing that it should have been free because it is a moral means refusing to call work work.

- Name the level and the scenarios in the estimate before kickoff, not before delivery.
- Split the work across content, layout, build, and the check.
- Put a retrofit of an old site on its own line.
- Do not accept plus thirty without a list of what will be checked.
03 Where +30% becomes a trick
The trick is to add a third to any estimate with the word WCAG and not name a single scenario. Then the number hides other wishes: a new block, a different animation, someone else's audit with no report. The client should ask which paths will be checked and what will be on the list of fixes.
The reverse trick is to promise conformance with no hours for a check. That is not a saving. It is a debt that will open at acceptance. A zero in the estimate for a topic you already promised your own client is not generosity. It is moving the bill to later.
Is the accessibility requirement named in the estimate now, or will it appear as a third on top once the screens are already approved?
04 How to split the work
Content provides text instead of meaning locked in a picture, and labels that mean something. The layout provides contrast, focus, and an order that does not fall apart on a phone. The build does not break that order in the code. The check walks the scenario instead of admiring a slide.
None of these roles gets to say accessibility is not us. That smearing is exactly what creates the surprise at the end. When each person sees their piece in the task, a dramatic separate surcharge often does not exist. Ordinary hours do.
To keep accessibility in the estimate rather than as a surprise, look at the projects, the studio approach, and write to contacts when the scenarios should be included before kickoff.
05 What to write in the estimate
Write the level you promise, the list of scenarios, and who accepts them. If an outside audit is needed, it stands as a line, not as a percent just in case. A retrofit of an old site also stands as a line, because it is a different scope from a new one.
Then the headline question has an answer. The owner of the product and of the contract pays. The sum has no right to appear from nowhere in the last week. Thirty percent is a warning about the price of silence at the start, not a price list to accept without a breakdown.